B.5 DOMS Interface
State: Not started
Time used: 0 md.
Description
Design a general DOMS access interface, which should also be the DOMS access point for the public libraries.
This interface may be the oai-provider given by ["TaskB.2"], in which case what is mostly needed is documentation (["TaskD"]?).
Sub tasks
Documentation
- [:TaskB.5AnalysisDocument:Analysis Document]
- [:TaskB.5DesignDocument:Design Document]
- [:TaskB.5SystemMaintenanceDocument:System Set-up and Maintenance Document]
Parent task
- ["TaskB"]
Progress history
PageDicts(Action,Iteration, Time used,Status,Notes,Tasks adressed ~= TaskB.5)
2008-05-26
This task was created after the DOMS-day discussions 2008-05-08.