Differences between revisions 1 and 2
Revision 1 as of 2008-06-26 12:26:14
Size: 2239
Editor: kfc
Comment: Created by the PackagePages action.
Revision 2 as of 2010-03-17 13:09:23
Size: 2239
Editor: localhost
Comment: converted to 1.6 markup
Deletions are marked like this. Additions are marked like this.
Line 17: Line 17:
See ["TaskC.1AnalysisDocumentDetails#PreservationStrategy"] See [[TaskC.1AnalysisDocumentDetails#PreservationStrategy]]
Line 19: Line 19:
See ["TaskC.1AnalysisDocumentDetails#PreservationEvaluation"] See [[TaskC.1AnalysisDocumentDetails#PreservationEvaluation]]

Analysis of Integrate with Planets for Preservation Planning (characterisation/migration)

When addressing this task, we should consult the following TDR requirements:

  • Need preservation strategy (Planets): B3.1, B3.2, B3.5, B3.9, B3.10, R65-67
  • Must be able to validate/evaluate results of preservation action (Planets): R66-67

See TaskC.1AnalysisDocumentDetails#PreservationStrategy

See TaskC.1AnalysisDocumentDetails#PreservationEvaluation

Prerequisites and Assumptions

The estimation of this task is based on these notes, which also should be taken into consideration when implementing the task:

BAM: Vi holder et møde...

TE: No comments.

TSH: Forundersøgelser påkrævet

MKE: PUNT

KFC: NEEDINFO Udskyd punktet til efter møde med Colin/Lars; KFC+BAM

TaskC.2AnalysisDocument (last edited 2010-03-17 13:09:23 by localhost)