Line 18: Line 18:
The Work Breakdown Structure ([:WBS:]) page must be reviewed and revised regularly, say at the end of each iteration, to ensure that any emerged subtasks are added, time consumption and time estimates are updated. The Work Breakdown Structure ([[WBS]]) page must be reviewed and revised regularly, say at the end of each iteration, to ensure that any emerged subtasks are added, time consumption and time estimates are updated.
Line 20: Line 20:
Any emerged sub tasks must be added to the [:WBS:] using the TaskTemplate. Any emerged sub tasks must be added to the [[WBS]] using the TaskTemplate.
Line 45: Line 45:
 * ["TaskG"]  * [[TaskG]]
Line 49: Line 49:
[[PageDicts(Action,Iteration, Time used,Status,Notes,Tasks adressed ~= TaskG.4)]] <<PageDicts(Action,Iteration, Time used,Status,Notes,Tasks adressed ~= TaskG.4)>>

G.4. Work Breakdown

State: In progress

Time used: 6 md. Note: Time used before iteration 3 not measured.

Description

The Work Breakdown Structure (WBS) page must be reviewed and revised regularly, say at the end of each iteration, to ensure that any emerged subtasks are added, time consumption and time estimates are updated.

Any emerged sub tasks must be added to the WBS using the TaskTemplate.

This task will be active during the whole project.

Parent task

Progress history

Iteration Time used Status Notes

2007-09-24

All WBS tasks have had descriptions of the task added. Some revision has been done in the progress.

TaskG.4 (last edited 2010-03-17 13:10:00 by localhost)