Differences between revisions 1 and 4 (spanning 3 versions)
Revision 1 as of 2008-06-26 12:26:15
Size: 2437
Editor: kfc
Comment: Created by the PackagePages action.
Revision 4 as of 2010-03-17 13:12:59
Size: 2526
Editor: localhost
Comment: converted to 1.6 markup
Deletions are marked like this. Additions are marked like this.
Line 18: Line 18:
All project management specific tasks goes into this section. These tasks serve as the project event memory, as all of the project management tasks are active through the entire duration of the project, then none of them will actually be finished before the project is finished. Thus, all this tasks must be revised on a regular basis to ensure that all information e.g. about risks, stakeholders and so on, are up to date. All project management specific tasks goes into this section. These tasks serve as the project event memory, as all of the project management tasks are active through the entire duration of the project, then none of them will actually be finished before the project is finished. Thus, all these tasks must be revised on a regular basis to ensure that all information e.g. about risks, stakeholders and so on, are up to date.
Line 22: Line 22:
 . [:TaskG.1:G.1. Roadmap/estimation]
 . [:TaskG.2:G.2. Stakeholder analysis]
 . [:TaskG.3:G.3. Risk analysis]
 . [:TaskG.4:G.4. Work Breakdown]
 . [[TaskG.1|G.1. Roadmap/estimation]]
 . [[TaskG.2|G.2. Stakeholder analysis]]
 . [[TaskG.3|G.3. Risk analysis]]
 . [[TaskG.4|G.4. Work Breakdown]]
Line 39: Line 39:
 * ["WBS"]  * [[WBS]]
Line 42: Line 42:

<<PageDicts(Action,Iteration, Time used,Status,Notes,Tasks adressed ~= TaskG)>>
Line 53: Line 55:
Made a round-up of what parts of this task have been made so far and by whom. See details [:RoundUpTaskG2008-04-24:here]. Made a round-up of what parts of this task have been made so far and by whom. See details [[RoundUpTaskG2008-04-24|here]].

G. Project Planning

State: In progress

Time used: 0 md.

Description

All project management specific tasks goes into this section. These tasks serve as the project event memory, as all of the project management tasks are active through the entire duration of the project, then none of them will actually be finished before the project is finished. Thus, all these tasks must be revised on a regular basis to ensure that all information e.g. about risks, stakeholders and so on, are up to date.

Sub tasks

Parent task

Progress history

Iteration Time used Status Notes

2008-04-24

Made a round-up of what parts of this task have been made so far and by whom. See details here.

TaskG (last edited 2010-03-17 13:12:59 by localhost)