## Please put instances of this task in the subfolder Tasks/ with name for the number, and subfolders as approproate, e.g. Tasks/X/Y ## If any of the below links or sections are not applicable to your page, then please comment them out rather than deleting ## as they may become relevant later on. ## Headline like "Task Implement Backup" = Task PLANETS = ## Task title Title:: PLANETS in DOMS ## Valid states: "Not started", "In progress" and "Finished" State:: ## The time used is measured in man days and does not include the time spent on any sub-tasks. As a rule of thumb, time should always be allocated to subtasks, rather than parent tasks. Format: Xmd Time used:: ## As time used Time estimated:: == Description == ## Add a high level task (goals / sub-goals) description here, sufficiently detailed to provide a background for creation of action descriptions. ## Any available (technical) details goes into the below documentation pages. The PLANETS project provides a toolset which will be used in DOMS for characterization of files before they are approved for longterm storage. Follow-up:: If more tools are needed for integration into DOMS-Planets, time should be allowed for this. The "Overview of Planets" talk resulted in choices about what development should be done in this task. See the analysis doc under Task 20.1. == Sub tasks == <> == Documentation == ## The documentation section links to the documentation relevant to this task and its sub-tasks (if any). ## ## The below links will automatically be expanded to page names like "Tasks/X/Y/AnalysisDocument" in your created page. ## This should be a proper default. ## ## DO NOT comment out these links. * [[Tasks/XX/AnalysisDocument|Analysis Document]] * [[Tasks/XX/DesignDocument|Design Document]] * [[Tasks/XX/SystemMaintenanceDocument|System Set-up and Maintenance Document]] == Progress history == <> ## Add information about about the current state of the task here. That is, information about what has been completed so far and ## what outstanding issues are left. Example: ## ##=== 2007-09-13 === ##Finished the design documentation. A review is needed before this task is completed. ## ##=== 2007-08-25 === ##Completed requirement specification. We are now ready for writing the design document.