Differences between revisions 1 and 2
Revision 1 as of 2009-06-17 12:23:11
Size: 2157
Editor: kfc
Comment:
Revision 2 as of 2009-06-17 13:04:28
Size: 2459
Editor: kfc
Comment:
Deletions are marked like this. Additions are marked like this.
Line 23: Line 23:

Review and approve the interface for the charac service. This include the soap interface, the java interface, the possible rest interface and the return values. These must all be of such a nature that this interface can be used to wrap many different tools. Look at the planets interfaces for this.

Task Review Interface

Title
Review Interface

State
Not started

Time used

Time estimated
5md

Description

Review and approve the interface for the charac service. This include the soap interface, the java interface, the possible rest interface and the return values. These must all be of such a nature that this interface can be used to wrap many different tools. Look at the planets interfaces for this.

Documentation

  • [:Tasks/6/1/AnalysisDocument:Analysis Document]

  • [:Tasks/6/1/DesignDocument:Design Document]

  • [:Tasks/6/1/SystemMaintenanceDocument:System Set-up and Maintenance Document]

Progress history

PageDicts(Actions/,Iteration,Time used,Status,Notes,Tasks adressed,Tasks adressed ~= Tasks/6/1)

Tasks/6/1 (last edited 2010-03-17 13:09:34 by localhost)