Differences between revisions 1 and 21 (spanning 20 versions)
Revision 1 as of 2009-01-12 13:04:44
Size: 3015
Editor: jrg
Comment:
Revision 21 as of 2010-03-17 13:08:49
Size: 4328
Editor: localhost
Comment: converted to 1.6 markup
Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
 Tasks adressed:: ["Collection"]  Tasks adressed:: [[Collection]]
Line 33: Line 33:
 Time used:: 0md  Time used:: 3.5 md
Line 45: Line 45:
 Status:: Not described  Status:: Finished
Line 68: Line 68:
Prepare release test (describing what should be checked, and what the success criteria are).

Structure of the release test may be inspired by release tests for the MiniDOMS for Aarbog - iterations 5,...,7. For example the
[[Iteration7ReleaseTest|release test of iteration 7]].

<<BR>>

---

<<BR>>

The definition of the steps in the release test is located [[ActionDDAReleaseTest|here]].

In defining the release test, we still need to take care of the following.

 * (DONE) Choose which objects will be tested with, and specify at "INSERT INFO HERE" on [[ActionDDAReleaseTest|this page]]. (PKO)

 * (DONE) Choose when to
   "Craft guaranteed valid FoxML objects for those objects chosen for testing."
   (sometime before the actual release test) and place it in the [[MiniDOMSWithDDAOverview|über action-list]]. (JRG)

 * (DONE) Choose which failing cases the failure tests should address.

 * (DONE) Plan the overall steps for the success test and each failure test. Make tables listing these steps.

 * (POSTPONED TO LATER ACTION) Specify the success test in more detail (as in iteration 7 release test).

 * (POSTPONED TO LATER ACTION) Specify each failure test in detail (as in iteration 7 release test).

 * (POSTPONED TO LATER ACTION) Estimate time for running the release test.
Line 70: Line 100:





<<BR>>

Action Prepare Release Test for De Danske Aviser

Assigned
PKO+JRG

Prev assigned

Tasks adressed

Collection

Time estimated
4 md (pairwork)

Time used
3.5 md

Priority
2

Status
Finished

Iteration
17

Notes

Prepare release test (describing what should be checked, and what the success criteria are).

Structure of the release test may be inspired by release tests for the MiniDOMS for Aarbog - iterations 5,...,7. For example the release test of iteration 7.


---


The definition of the steps in the release test is located here.

In defining the release test, we still need to take care of the following.

  • (DONE) Choose which objects will be tested with, and specify at "INSERT INFO HERE" on this page. (PKO)

  • (DONE) Choose when to
    • "Craft guaranteed valid FoxML objects for those objects chosen for testing."

      (sometime before the actual release test) and place it in the über action-list. (JRG)

  • (DONE) Choose which failing cases the failure tests should address.
  • (DONE) Plan the overall steps for the success test and each failure test. Make tables listing these steps.
  • (POSTPONED TO LATER ACTION) Specify the success test in more detail (as in iteration 7 release test).
  • (POSTPONED TO LATER ACTION) Specify each failure test in detail (as in iteration 7 release test).
  • (POSTPONED TO LATER ACTION) Estimate time for running the release test.


Checklist For Working On An Action

The Life Cycle of an Action:

  • Assign people for action definition: Done at start of iteration status meeting. Fill out Assigned

  • Define the action: Describe information about what is to be done and how. Fill out Tasks Addressed and Time Estimated.

  • Review the definition: Get another project group member to review the action definition, and update it.

  • Assign people for action implementation: Done by project manager, usually the same persons who wrote the definition. Fill out Assigned and Prev assigned if new persons are assigned.

  • Implement the action: See details below

  • Review the action: Get another project group member to review what is implemented (code and documentation), and update it.

  • Finish the action: Change the status to "Finished" and update the "time used" field on the action page.

Please make sure that you address the below issues, when working on an action:

  • Update the state of the action to "In Progress" when you start working on it.
  • Check if the tasks addressed by this action have their status set to "In Progress". If that is not the case, then change the state of them.
  • Keep track of how much time that has been spent working on the action. If it addresses more than one task, then make a note on the action page about how much of the elapsed time that has been spent on the individual tasks. Hint: Continually updating the "Time used" field will make it easier for you.

  • Update the "Progress History" and documentation pages of each task addressed by this action when appropriate. This depends on the situation, but in general, the task pages should hold all important related information about the work done, experiences gathered, identified requirements and so on.

ActionDDAPrepareReleaseTest (last edited 2010-03-17 13:08:49 by localhost)