Differences between revisions 7 and 9 (spanning 2 versions)
Revision 7 as of 2008-12-02 09:30:24
Size: 3868
Editor: bam
Comment:
Revision 9 as of 2008-12-11 08:44:24
Size: 4296
Editor: bam
Comment: progress ActionExampleContentModelsAndTemplates updated
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:

Line 11: Line 9:

Line 16: Line 12:

Line 23: Line 17:

Line 27: Line 19:
 Time estimated:: not done

 Time estimated:: 3md
Line 33: Line 23:
 Time used:: 0md

 Time used:: 1md(BAM) + ?(JRG) + ?(ABR)
Line 41: Line 29:

Line 45: Line 31:
 Status:: Described, estimates and review needed
 Status:: In progress
Line 52: Line 37:

Line 57: Line 40:



Line 66: Line 45:
== Description ==
Line 73: Line 53:
    . {{{merkur.statsbiblioteket.dk/svn/doms/trunk/avis_objects}}} contains 3 content models, 2 schemas and a collection corresponding to data model below.     . Meeting 2008-12-02 to decide the model for Avis. Time estimate: 1/4 md.
. {{{merkur.statsbiblioteket.dk/svn/doms/trunk/avis_objects}}} contains 3 content models, 2 schemas and a collection corresponding to data model below.      . Template objects still missing. Time estimate: 1/4 md.
    . Set up GUI prototype with templates, such that EK can fill in metadata. Time estimate: 1/4 md + EK time.
Line 76: Line 59:
    . Meeting 2008-12-02 to decide the model for Avis.
Line 78: Line 60:
    .     . metadata: attachment:PB_Core_radio.doc
    . no model yet. Time estimate: 1md + EK time
Line 80: Line 63:
    . model is expected to look like spolebaand. Time estimate: 1md + EK time
Line 81: Line 65:
== Progress ==
Line 82: Line 67:





 1. Avis: Content models + templates done.
 2. Radio: Content models + templates done.

Action Example ContentModels and Templates

Assigned
BAM+JRG

Prev assigned

Tasks adressed
["TaskX/1"]

Time estimated
3md

Time used
1md(BAM) + ?(JRG) + ?(ABR)

Priority
1

Status
In progress

Iteration
16

Notes

Description

Example objects for several different collections need to be put in the testbed. In order for this to be possible, content models and template objects must first be written. This action comprises the development of the content models and templates. EK will implement the actual example objects - preferably via an installation of the DOMS GUI.

The priorities for subparts of this action

  1. Avis (content models already done, it is said.. before this iteration.)
    • Meeting 2008-12-02 to decide the model for Avis. Time estimate: 1/4 md.
    • merkur.statsbiblioteket.dk/svn/doms/trunk/avis_objects contains 3 content models, 2 schemas and a collection corresponding to data model below.

    • Template objects still missing. Time estimate: 1/4 md.
    • Set up GUI prototype with templates, such that EK can fill in metadata. Time estimate: 1/4 md + EK time.
    • attachment:Avis-collection.dia
    • http://merkur.statsbiblioteket.dk/svn/doms/trunk/avis_objects/fig/Avis-collection.png

  2. Radio
    • metadata: attachment:PB_Core_radio.doc
    • no model yet. Time estimate: 1md + EK time
  3. Valser
    • model is expected to look like spolebaand. Time estimate: 1md + EK time

Progress

  1. Avis: Content models + templates done.
  2. Radio: Content models + templates done.

Checklist For Working On An Action

The Life Cycle of an Action:

  • Assign people for action definition: Done at start of iteration status meeting. Fill out Assigned

  • Define the action: Describe information about what is to be done and how. Fill out Tasks Addressed and Time Estimated.

  • Review the definition: Get another project group member to review the action definition, and update it.

  • Assign people for action implementation: Done by project manager, usually the same persons who wrote the definition. Fill out Assigned and Prev assigned if new persons are assigned.

  • Implement the action: See details below

  • Review the action: Get another project group member to review what is implemented (code and documentation), and update it.

  • Finish the action: Change the status to "Finished" and update the "time used" field on the action page.

Please make sure that you address the below issues, when working on an action:

  • Update the state of the action to "In Progress" when you start working on it.
  • Check if the tasks addressed by this action have their status set to "In Progress". If that is not the case, then change the state of them.
  • Keep track of how much time that has been spent working on the action. If it addresses more than one task, then make a note on the action page about how much of the elapsed time that has been spent on the individual tasks. Hint: Continually updating the "Time used" field will make it easier for you.

  • Update the "Progress History" and documentation pages of each task addressed by this action when appropriate. This depends on the situation, but in general, the task pages should hold all important related information about the work done, experiences gathered, identified requirements and so on.