Line 28: Line 28:
[:MaintenanceAgreementMiniDOMS: Production Agreement] [[MaintenanceAgreementMiniDOMS| Production Agreement]]
Line 38: Line 38:
 * [:Minutes/2007-12-20: Referat 2007-12-20]
 * [:Minutes/2008-01-10: Referat 2008-01-10]
 * [:Minutes/2008-01-28: Referat 2008-01-28]
 * [[Minutes/2007-12-20| Referat 2007-12-20]]
 * [[Minutes/2008-01-10| Referat 2008-01-10]]
 * [[Minutes/2008-01-28| Referat 2008-01-28]]

Action System Setup Agreement

As the miniDOMS is to be handed over to Maintenance, we need to have responsibilities specified. This include:

  • (DONE) Who will perform the ingest of objects to miniDOMS
  • (DONE) The final bitstorage system must be established, and agreed to by both parties
  • (DONE) The tomcat server must be installed, and maintenance of it must be agreed. The tomcat server must be configured to use Fedora.

Total: Probably 1-2 meetings. 2 md, so that 2 persons can use 1 entire day for meetings. This should be enough.

  • (3 md) A general procedure for bug reports and failure handling between the DOMS team and Maintenance must be agreed upon. Helpdesk must be notified.

In addition:

  • We need to make an agreement with Maintenance about when the work above will be completed.

Current status

DONE, if no complains arise.

13/3-08 We have reached a new agreement with the Maintenance department, described in Production Agreement

Time used: (ABRs estimates, change as you like)

  • ABR: 6h
  • JRG: 2h
  • KFC: 5h

Old Ressources

We have met with Drift, to determine what they can deliver, and when. The results of this can be seen in:

ActionSystemSetupAgreement (last edited 2010-03-17 13:12:50 by localhost)