Agendas 2007-11-22
0. Agenda walkthrough
1. Iteration 5 status
For each action:
- Action status (done/outstansing issues), time spent
- Any information that should be shared
- Any planning we need to do
Priority |
Action Description |
Estimated time |
Tasks adressed |
Responsible |
Status |
1 |
[:ActionDesignAndSalvageIngestModule:Design ingest module, migrate pre-analysis project ingest code] |
12 md |
["TaskA.4.1"] |
TE (6 md), TSH (6 md) |
In Progress |
1 |
[:ActionSalvageDataModel:Salvage data model from pre-analysis project, document, identify unresolved issues] |
6 1/4 md |
["TaskA.2.2"], ["TaskA.2.3"] |
BAM (2 1/4), MKE (4) |
Done with outstanding issues |
3 |
[:ActionGentofte:Identify "Gentofte" objects, design datamode] |
5½ md |
["TaskA.2.2"] Collection |
BAM (2), MKE(3½) |
Done |
1 |
[:ActionStudyGroup:Study group with Asger and Jeppe: setup Idea/SVN, go through WBS, go through guidelines, identify relevant study material] |
10½ md |
["TaskF"] ["TaskG"] |
TSH (½), KFC(1), JRG(4½), ABR(4½) |
In Progress |
5 |
[:ActionRiskAndStakeholderResults:Present results of risk and stakeholder analysis and communication plan, plan actions suggested by these including communication with external partners] |
4½ md |
["TaskG.2"] ["TaskG.3"] |
KFC(2), TSH(1½) |
Not started |
2 |
[:ActionReleasetest5:Prepare releasetest. Goal: Running the migrated ingest code on test objects in test setup. Use Fedora tools to see they are ingested properly] |
3 md. |
Release test |
KFC(2½), TE(½) |
Not started |
3. Release test
4. Risks and stakeholders
- Go through tables
- Look at actions we need to take
5. End of iteration tasks
- Communication
- Steering committee
- Followup on task status
6. Next iteration
- Only JRG/ABR/KFC
- Suggest datamodel and pre-ingest
7. Next full iteration
- Starts 2007-12-17
- Suggest Summa integration, bit storage
8. AOB
- KFC has visited department