Size: 3669
Comment:
|
Size: 3714
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 44: | Line 44: |
|| DOMS || (2011-01-17) Stage candidate 4 submitted || awaiting response.. || || | || DOMS || (2011-01-17) Stage candidate 4 submitted || ready for stage test.. (and awaiting candidate 5..) || || |
Line 46: | Line 46: |
|| DigiTV || (2011-01-13) Stage candidate 9 submitted, accepted || ready for internal test.. || some tests done (not in stage), not complete.. [[http://intrawikis/digitalttv/STAGETest3|Test]]|| || IP Role-mapper || (2010-??-??) Stage candidate 1 submitted, accepted || (awaiting production..) || pending.. || || Summa (backend) || (2011-01-07) Stage candidate 1 submitted, accepted || ready || pending.. || || Wowza with plugins || (2011-01-11) Stage candidate 2 submitted, accepted || ready for internal test.. || pending.. || || Broadcast Extraction Service (BES) || (2011-01-06) Stage candidate 1 submitted, accepted || ready for internal test.. || pending.. || || Web frontend (Radio/TV DOMS Portal) || || awaiting being pushed to stage.. || || |
|| DigiTV || (2011-01-13) Stage candidate 9 submitted, accepted || ready for stage test.. || some tests done (not in stage), not complete.. [[http://intrawikis/digitalttv/STAGETest3|Test]]|| || IP Role-mapper || (2010-??-??) Stage candidate 1 submitted, accepted || ready for stage test.. || pending.. || || Summa (backend) || (2011-01-07) Stage candidate 1 submitted, accepted || ready for stage test.. || pending.. || || Wowza with plugins || (2011-01-11) Stage candidate 2 submitted, accepted || ready for stage test.. || pending.. || || Broadcast Extraction Service (BES) || (2011-01-06) Stage candidate 1 submitted, accepted || ready for stage test.. || pending.. || || Web frontend (Radio/TV DOMS Portal) || (2011-01-17) Stage candidate 1 submitted, accepted || ready for stage test.. || pending.. || |
Install-sequence for parts of the DOMS system, including its environment
The sequence in which each part should be installed, for integration of DOMS with Radio/TV.
Step 1
The following three can be installed in any order
Step 2
Install DOMS Ingester
depends on DOMS
Install Summa (backend)
depends on DOMS
Step 3
Install Wowza with plugins
depends on DOMS and Broadcast Extraction Service (BES)
Install Broadcast Extraction Service (BES)
depends on Wowza with plugins and DOMS
Step 4
Install Web frontend (Radio/TV DOMS Portal)
depends on Broadcast Extraction Service (BES), Wowza with plugins, Summa (backend), IP Role-mapper and DOMS
Locations of different parts (in integration test)
DOMS
- Auth checker: port 7980, otherwise "as usual"
- Ticket issuer: port 7980, otherwise "as usual"
IP Role-mapper: port 7950, otherwise "as usual"
Wowza with plugins
- Streaming URL:
- rtmp://iapetus:1937/doms
- rtmp://iapetus:1937/domslive
- Media files location:
- iapetus:/home/doms/streamingContent
- iapetus:/home/doms/streamingContentLive
- Streaming URL:
Status of the different install units (for stage)
Install unit |
Status |
Next action |
Status of stage test |
DOMS |
(2011-01-17) Stage candidate 4 submitted |
ready for stage test.. (and awaiting candidate 5..) |
|
DOMS Ingester |
(2011-01-14) Stage candidate 1 submitted |
awaiting response.. |
|
DigiTV |
(2011-01-13) Stage candidate 9 submitted, accepted |
ready for stage test.. |
some tests done (not in stage), not complete.. Test |
IP Role-mapper |
(2010-??-??) Stage candidate 1 submitted, accepted |
ready for stage test.. |
pending.. |
Summa (backend) |
(2011-01-07) Stage candidate 1 submitted, accepted |
ready for stage test.. |
pending.. |
Wowza with plugins |
(2011-01-11) Stage candidate 2 submitted, accepted |
ready for stage test.. |
pending.. |
Broadcast Extraction Service (BES) |
(2011-01-06) Stage candidate 1 submitted, accepted |
ready for stage test.. |
pending.. |
Web frontend (Radio/TV DOMS Portal) |
(2011-01-17) Stage candidate 1 submitted, accepted |
ready for stage test.. |
pending.. |
Once in stage, only maintenance may run scripts - and need to be ping'ed for running anything needed for testing. DOMS + DigiTV + Summa people will get read-only access for inspecting the results of stage tests. Unit-specific stage tests are linked in the table above. Tests of the system as a whole is described here: Stage-Test of DOMS RadioTV System.
NOTICE: As we go PROD, we will need atleast one day (before communicating prod to doms control group) in order to be able to test that our system can indeed be reached by the two machines on "fagsalen", and indeed cannot be reached by people outside.