Install-sequence for parts of the DOMS system, including its environment

The sequence in which each part should be installed, for integration of DOMS with Radio/TV.

Step 1

The following three can be installed in any order

Step 2

Step 3

Step 4

Locations of different parts (in integration test)

Status of the different install units (for stage)

Install unit

Status

Next action

Status of stage test

DOMS

(2011-01-17) Stage candidate 4 submitted

awaiting candidate 5..

DOMS Ingester

(2011-01-14) Stage candidate 1 submitted

awaiting response..

DigiTV

(2011-01-13) Stage candidate 9 submitted, accepted

ready for internal test..

some tests done (not in stage), not complete.. Test

IP Role-mapper

(2010-??-??) Stage candidate 1 submitted, accepted

(awaiting production..)

pending..

Summa (backend)

(2011-01-07) Stage candidate 1 submitted, accepted

ready

pending..

Wowza with plugins

(2011-01-11) Stage candidate 2 submitted, accepted

ready for internal test..

pending..

Broadcast Extraction Service (BES)

(2011-01-06) Stage candidate 1 submitted, accepted

ready for internal test..

pending..

Web frontend (Radio/TV DOMS Portal)

awaiting being pushed to stage..

Once in stage, only maintenance may run scripts - and need to be ping'ed for running anything needed for testing. DOMS + DigiTV + Summa people will get read-only access for inspecting the results of stage tests. Unit-specific stage tests are linked in the table above. Tests of the system as a whole is described here: Stage-Test of DOMS RadioTV System.

NOTICE: As we go PROD, we will need atleast one day (before communicating prod to doms control group) in order to be able to test that our system can indeed be reached by the two machines on "fagsalen", and indeed cannot be reached by people outside.