⇤ ← Revision 1 as of 2008-06-26 12:26:04
Size: 1594
Comment: Created by the PackagePages action.
|
← Revision 2 as of 2010-03-17 13:10:00 ⇥
Size: 1604
Comment: converted to 1.6 markup
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
This action includes a meeting with CSR about [http://www.digitalpreservationeurope.eu/ Digital Preservation Europe (DPE)] and any standards or checklists that can be used to identify requirements for trusted digital repositories, '''and''' a meeting with LC about [http://www.planets-project.eu/ Planets] which might offer practical digital preservation services and tools as well as requirements. '''And''' determing which of the found requirements apply and how they apply to the DOMS project. | This action includes a meeting with CSR about [[http://www.digitalpreservationeurope.eu/|Digital Preservation Europe (DPE)]] and any standards or checklists that can be used to identify requirements for trusted digital repositories, '''and''' a meeting with LC about [[http://www.planets-project.eu/|Planets]] which might offer practical digital preservation services and tools as well as requirements. '''And''' determing which of the found requirements apply and how they apply to the DOMS project. |
Line 10: | Line 10: |
Meeting with CSR was held on July 5th (2007). KFC and BAM have looked at the [http://www.rlg.org/en/page.php?Page_ID=20769 RLG/NARA Audit Checklist for Certifying Digital Repositories] and the [http://wiki.statsbiblioteket.dk/drambora/DRAMBORAStart?action=AttachFile&do=get&target=DRAMBORA_guide.pdf DRAMBORA generic list of risks] relative to the DOMS project. A list of relevant requirements can be found in the [:TaskC.1AnalysisDocument:Analysis Document for TaskC.1]. | Meeting with CSR was held on July 5th (2007). KFC and BAM have looked at the [[http://www.rlg.org/en/page.php?Page_ID=20769|RLG/NARA Audit Checklist for Certifying Digital Repositories]] and the [[http://wiki.statsbiblioteket.dk/drambora/DRAMBORAStart?action=AttachFile&do=get&target=DRAMBORA_guide.pdf|DRAMBORA generic list of risks]] relative to the DOMS project. A list of relevant requirements can be found in the [[TaskC.1AnalysisDocument|Analysis Document for TaskC.1]]. |
Line 15: | Line 15: |
This action contributes to the completion of the below tasks from the [:WBS:Work Breakdown Structure] (WBS): * [:TaskC:] * [:TaskC.1:] |
This action contributes to the completion of the below tasks from the [[WBS|Work Breakdown Structure]] (WBS): * [[TaskC]] * [[TaskC.1]] |
Line 21: | Line 21: |
* ["kfc"], ["bam"] | * [[kfc]], [[bam]] |
Call Meetings with DPE and Planets to Clarify Requirements for Trusted Digital Repositories
This action includes a meeting with CSR about Digital Preservation Europe (DPE) and any standards or checklists that can be used to identify requirements for trusted digital repositories, and a meeting with LC about Planets which might offer practical digital preservation services and tools as well as requirements. And determing which of the found requirements apply and how they apply to the DOMS project.
Status
Meeting with CSR was held on July 5th (2007). KFC and BAM have looked at the RLG/NARA Audit Checklist for Certifying Digital Repositories and the DRAMBORA generic list of risks relative to the DOMS project. A list of relevant requirements can be found in the Analysis Document for TaskC.1.
Meeting with LC will be scheduled as soon as possible.
Targeted WBS Tasks
This action contributes to the completion of the below tasks from the Work Breakdown Structure (WBS):
Assigned Developers
The below developers are assigned to execute this action: