⇤ ← Revision 1 as of 2008-06-26 12:26:05
Size: 2430
Comment: Created by the PackagePages action.
|
← Revision 2 as of 2010-03-17 13:09:23 ⇥
Size: 2436
Comment: converted to 1.6 markup
|
Deletions are marked like this. | Additions are marked like this. |
Line 13: | Line 13: |
||1 || [:ActionDesignAndSalvageIngestModule:Design ingest module, migrate pre-analysis project ingest code] || 12 md || ["TaskA.4.1"] ||TE (6 md), TSH (6 md) || In Progress || ||1 || [:ActionSalvageDataModel:Salvage data model from pre-analysis project, document, identify unresolved issues] || 6 1/4 md || ["TaskA.2.2"], ["TaskA.2.3"] ||BAM (2 1/4), MKE (4) || Done with outstanding issues || ||3 || [:ActionGentofte:Identify "Gentofte" objects, design datamode] || 5½ md || ["TaskA.2.2"] Collection ||BAM (2), MKE(3½) || Done || ||1 || [:ActionStudyGroup:Study group with Asger and Jeppe: setup Idea/SVN, go through WBS, go through guidelines, identify relevant study material] || 10½ md || ["TaskF"] ["TaskG"] || TSH (½), KFC(1), JRG(4½), ABR(4½) || In Progress || ||5 || [:ActionRiskAndStakeholderResults:Present results of risk and stakeholder analysis and communication plan, plan actions suggested by these including communication with external partners] ||4½ md || ["TaskG.2"] ["TaskG.3"] ||KFC(2), TSH(1½) || Not started || ||2 || [:ActionReleasetest5:Prepare releasetest. Goal: Running the migrated ingest code on test objects in test setup. Use Fedora tools to see they are ingested properly] || 3 md. || Release test ||KFC(2½), TE(½) || Not started || |
||1 || [[ActionDesignAndSalvageIngestModule|Design ingest module, migrate pre-analysis project ingest code]] || 12 md || [[TaskA.4.1]] ||TE (6 md), TSH (6 md) || In Progress || ||1 || [[ActionSalvageDataModel|Salvage data model from pre-analysis project, document, identify unresolved issues]] || 6 1/4 md || [[TaskA.2.2]], [[TaskA.2.3]] ||BAM (2 1/4), MKE (4) || Done with outstanding issues || ||3 || [[ActionGentofte|Identify "Gentofte" objects, design datamode]] || 5½ md || [[TaskA.2.2]] Collection ||BAM (2), MKE(3½) || Done || ||1 || [[ActionStudyGroup|Study group with Asger and Jeppe: setup Idea/SVN, go through WBS, go through guidelines, identify relevant study material]] || 10½ md || [[TaskF]] [[TaskG]] || TSH (½), KFC(1), JRG(4½), ABR(4½) || In Progress || ||5 || [[ActionRiskAndStakeholderResults|Present results of risk and stakeholder analysis and communication plan, plan actions suggested by these including communication with external partners]] ||4½ md || [[TaskG.2]] [[TaskG.3]] ||KFC(2), TSH(1½) || Not started || ||2 || [[ActionReleasetest5|Prepare releasetest. Goal: Running the migrated ingest code on test objects in test setup. Use Fedora tools to see they are ingested properly]] || 3 md. || Release test ||KFC(2½), TE(½) || Not started || |
Agendas 2007-11-22
0. Agenda walkthrough
1. Iteration 5 status
For each action:
- Action status (done/outstansing issues), time spent
- Any information that should be shared
- Any planning we need to do
Priority |
Action Description |
Estimated time |
Tasks adressed |
Responsible |
Status |
1 |
Design ingest module, migrate pre-analysis project ingest code |
12 md |
TE (6 md), TSH (6 md) |
In Progress |
|
1 |
Salvage data model from pre-analysis project, document, identify unresolved issues |
6 1/4 md |
BAM (2 1/4), MKE (4) |
Done with outstanding issues |
|
3 |
5½ md |
TaskA.2.2 Collection |
BAM (2), MKE(3½) |
Done |
|
1 |
10½ md |
TSH (½), KFC(1), JRG(4½), ABR(4½) |
In Progress |
||
5 |
4½ md |
KFC(2), TSH(1½) |
Not started |
||
2 |
3 md. |
Release test |
KFC(2½), TE(½) |
Not started |
3. Release test
4. Risks and stakeholders
- Go through tables
- Look at actions we need to take
5. End of iteration tasks
- Communication
- Steering committee
- Followup on task status
6. Next iteration
- Only JRG/ABR/KFC
- Suggest datamodel and pre-ingest
7. Next full iteration
- Starts 2007-12-17
- Suggest Summa integration, bit storage
8. AOB
- KFC has visited department